Featured Projects



130-Ton Chiller Replacement

Our service team recently completed a 130-ton chiller replacement at a hotel in downtown San Antonio. From coordinating an overnight crane lift to ensuring the new system was up and running while minimizing downtime, this project was a true team effort from start to finish.


New Construction Package Unit Lift

Take a look inside the average day of a construction team member here at Holts Mechanical! Pictured below, we see the process of installing package units at a newly constructed business park.


Historic Crockett Hotel Project

Our team partnered with CSE Electric to replace a cooling tower section at the Crockett Hotel — a building that's been standing next to the Alamo since 1909, right on the ground where Davy Crockett and his men once defended the southeast palisade.


Package Unit Replacement - Private Hanger

Our team recently installed a 30-ton Trane package unit at a private hanger. This project was a unique undertaking with the unit being located on the ground, a rarity for this large of a unit.


Rooftop Package Unit Changeout - The Commons at Sonterra

Our team replaced two 35-ton Trane package units at a Class A office building.


Warehouse Package Unit Installation

Our construction team installed three Trane 15-ton package units in an existing warehouse space. The project was coordinated closely with the general contractor to meet the tenant's occupancy schedule.


Chiller Replacement - Carrier AquaSnap

When a failing 1996 chiller experienced major refrigerant loss, our service team implemented a temporary solution to maintain partial cooling while a replacement Carrier AquaSnap chiller was procured. Once equipment arrived, Holts Mechanical completed the installation and startup, minimizing downtime for the facility.


After-Hours Mall Replacement

To avoid any disruption to mall operations and shoppers, our team executed the replacement of three 15 ton package units entirely overnight. We coordinated crane operations, removed existing equipment, and set and connected the new equipment before the mall reopened the next morning.


Large Scale Chiller Installation - 400 Ton Daikin

Our team installed a 400 ton Daikin chiller at a pharmaceutical production and warehouse facility.!--Do we want to mention the pipe connections available in case the chiller goes down?--><


Emergency Smoke Exhaust System - Make-Up Air Damper Installation

This large make-up fresh air damper was installed at a shopping mall, over the food court area. In the event of a fire, the air conditioning units and exhaust fans activate, removing smoke, carbon dioxide, carbon monoxide and chemicals from the building.

This fresh air damper then opens, drawing in fresh outside air and preventing negative air pressure & backdrafting issues inside the building.


Multi-Unit Rooftop Changeout

Our team replaced four aging rooftop package units across a commercial business park. The project included installing curb adapters to accommodate the updated unit footprint.

Carrier Chill Water Coil Replacement - San Antonio ISD

During Winter Storm Uri in February 2021, freezing temperatures caused catastrophic pipe failures at a local public school, bursting one chilled water coil, and two hot water coils inside the air handler. Our team was called in to perform an emergency replacement, sourcing new coils and completing the installation during the winter break to minimize disruption to students and staff. All new coils were fully insulated and pressure tested before use.